Planning & Design

Information Technology Addition to Library/Media Center

 

 

Architect:
Morris Architects

Contractor:
TBD

Program / Construction Manager:
lpi, Inc.

Status:
Construction Document Phase

The Information Technology, Network and Telecommunications departments are to be relocated from their current locations in Drescher Hall to a new location that is south of the Library/Media Center. Currently in that location is a temporary building designated as Library Village. The master plan proposes that an addition to the Library/Media Center be added to the south of the existing facility. The existing Media Center has several technology related functions and can be reconfigured to take advantage of a combined facility with Information Technology. The new facility will house programming and technical staff and the main server room. There will be approximately 14,000 square feet of new construction and up to 11,000 square feet of renovation.

Funding Sources:
Measure AA

[ Back to Top ]

Health/PE/Fitness & Dance Building

 

Architect:
Gensler Architects

Contractor:
TBD

Status:
Construction Document Phase


The current 1950’s era one-story Locker Room building will be demolished and a new two-story 50,000 square foot Fitness building will be constructed within the same footprint. In addition, approximately 5,000 square feet of the adjacent Gym building will be renovated as part of the project. The new facility will consist of a fitness center, weight training, adaptive/rehab lab, dance studios, classrooms, training rooms, and locker rooms.

Funding Sources:
Measure AA

[ Back to Top ]

Performing Arts Campus East Wing Renovation

Architect:
DLR Group / WWCOT

Program / Construction Manager:
LPI, Inc

Status:
Construction Document Phase

The Performing Arts Campus was formerly the Madison Elementary School. The District has done several renovations to the campus and has recently added the Broad Stage and Edye Second Space as part of a Performing Arts Center. The campus is also home to the Music Department. Constructed in the 1930’s the original building’s East Wing has some seismic deficiencies that need to be remedied. The one-story East Wing currently houses a multipurpose room and some offices. The Facilities Master Plan shows the east wing being replaced by a new two-story facility that would include a multipurpose room, offices and music classroom/labs. Approximately 4,500 GSF would be demolished and replaced by a new building of approximately 12,000 GSF.

Funding Sources:
Measure AA

[ Back to Top ]